A Section 73 submission was required to amend an extant consent for a mixed-use development of seven to ten storeys plus basement, comprising retail/food uses, offices and a hotel. The drawings show coordination changes driven by updated servicing, energy and fire strategy requirements, and operator room layouts.

The basement footprint was reduced and reconfigured around hotel back-of-house, plant and a dedicated goods lift. At ground floor, the entrance, lobby/core arrangement and a defined deliveries route were adjusted, with a new substation within the courtyard. Upper floors were extended locally, the courtyard lightwell removed, and typical room layouts and windows rationalised.
Location:
Putney High Street, Putney
Type:
Hotel
Status:
Services provided:
Constraints:
If you'd like to discuss a project, send us a message using the form and we'll be in touch.
You can also give us a call to talk things through.
Curio Architects
Unit 205, The Print Rooms
164-180 Union Street
London
SE1 0LH
© 2026 Curio Architects Limited. All rights reserved.